Thursday, August 22, 2013

How artificial lawn dormant for conservation?

How artificial lawn dormant for conservation?

Into the winter, dormant lawns in an extremely fragile state, vulnerable to external damage. Because to establish turf protection flags, strengthen personnel patrol tube to prevent pedestrians from vehicles of excessive trampling and crushing. If the dormant period and wear due to trampling the lawn rolling aboveground, underground parts will be frost and death, thereby affecting the timeliness turning green lawn next year. Temperatures rise, some will be germinating lawn, lawn start tiller, fear trampling trampling should be avoided as much as possible, resulting in soil compaction, so that the lawn bald spots forming phenomenon.

Do Lawn Maintenance management summary, the production of labor, plant protection, fertilization, irrigation, mowing, weeding and other work to conduct a comprehensive statistics, compared with the original plan, to see what kind of work is not completed, what work needs to be improved, so that maintenance work further improved. In conclusion, based on the work of last year to do the production planning, budgeting, purchasing materials, pesticides, fertilizers, equipment, facilities, etc., to prepare and employment, and make this year the implementation of technical measures. In large sand arid regions, especially when seeding lawns should continue to make up the frozen water. At this point irrigation low temperatures, in order to prevent ice phenomenon, should be in the sunny 10:00 pm to 15:00 between watering, the soil can be quickly absorbed in the temperature dropped to complete this work, and timely return.

In addition to these measures, to protect but also to achieve a reasonable period of dormancy lawn fertilization, cold fire.

Cool-season lawns in the dormant winter, you can add a certain amount of applied organic fertilizer, improve soil structure, promote beneficial microbial activity in soil, improve soil temperature, enhance soil fertility, reduce diseases. All localities should combine local climatic factors, local conditions, flexible use. In the dressing should be done fertilizer evenly, avoiding "spotted"; fertilize the lawn before pruning, watering immediately after fertilization to prevent burns lawn.

For laid late or late fall lawn seeding in winter dormancy period as may be appropriate to use the non-woven fabric cover, plastic film, such as ash or straw covered cold, to prevent frost damage. Winter dormancy period of the lawn after another into the withering period, then prone to fires, especially in crowded places staff activities in particular should pay attention to. In addition to doing a reasonable before winter pruning, removing grass cushion is too thick, it should also clean up litter on the lawn, these flammable substances, could easily lead to fires.

Wednesday, August 14, 2013

synthetic turf is a rich diversity of visual pleasure

Pleasant green lawn although to a certain extent, to beautify the urban environment, but in practice proved that the development of urban green lawn causing a serious shortage of green models and do not form a reasonable three-dimensional space of the green network, but also to build lawn high cost, consumption more water, and many other ills.

Some people think that lawn uniform, Greenery, such as blankets, like the scenery, like fashion style abroad. However, from an ecological point of view, synthetic turf is a rich diversity of visual pleasure, which is like you are more willing to look rich and diverse forests, rather than those neat monotonous large lawn. Second, the economic cost is likely to cause the illusion. Same size lawns and forests, people often mistakenly think that grass, low cost, planting more costly, in fact, quite the opposite. Moreover lawn too much water, the lack of biological diversity, the European countries almost no kind of it. Quick success also formed an important reason for the hot lawn. Grass fast and effort, while planting trees is difficult, cycle long, slow, some officials in pursuit of green achievements, excluding the actual results, a large number of built lawn, resulting in a great waste of financial resources.

synthetic turf


From the global scope is concerned, this result is precisely the goal of improving the ecological environment is contrary. Application of scientific methods to urban greening gradual manner, the urban greening as "image projects", only to make green bubble, no end of trouble. Ecological effect is the sole criterion for testing ecological means. Our city from the grass in the wake of bitter brought by enthusiastic grass transition to "retreat grass also tree", synthetic turf should be a good sign.

Now most of our grass some prescriptive requirements, such as how much square green area to reach by how much, but kind of a nobody, is very extensive pipe is pipe. Do not meet the growth pattern of the lawn. Today, many manufacturers began to transition engine for lawn machinery, and domestic lawn mowers will gradually occupy the domestic market because of its price is much lower than that of imports.

Thursday, August 8, 2013

synthetic grass market capacity reached ten million


synthetic grass market capacity reached ten million, the scale of the strength of domestic enterprises with lawn grass fiber production capacity, independent research and development stage into. And lawn grass fiber production technology has reached world-class level, a number of domestic enterprises to obtain a FIFA-site certification, making the domestic end-users get the maximum benefit, you can purchase in the domestic market to the international quality standard products. The future, China and lawn grass fibers on the strength of downstream processes will be fully integrated in the enterprise, that enterprise competitiveness will also have the production capacity and lawn grass fibers.

synthetic grass


As in the domestic real master synthetic grass laying technology manufacturers are small and they are mostly foreign technology, therefore, is not sufficient in the laying of sand synthetic grass, especially when laying shock-absorbing foam cushion layer must be done by the foreign experts. A layer of shock-absorbing foam underneath to smooth asphalt as a basis for the following also covered with asphalt gravel, sand and gravel as the basis of which the construction of the drainage system is the most critical part. In addition, this type of synthetic grass during the installation process be sure to use artificial turf special machinery, especially in some professional or costly installation laying of sports venues is particularly important, otherwise it will not be able to reach ground leveling and uniformity requirements .

Today, there are still some owners on how to choose a high standard, quality and reliable products in the lawn doubts, in fact, get FIFA venues certification business is the highest guarantee of product quality. As is currently the highest standards of performance soccer grass makers, synthetic grass for FIFA to increase promotional efforts to encourage FIFA to increase the number of certified sites, to improve the overall quality level of the venue, especially for developing countries outside Europe FIFA with local sports organizations or government agencies, FIFA introduced a number of preferential policies to encourage the laying of the venue and the use of authentication. Early 2009 was also modified and the introduction of new standards for synthetic grass soccer grass performance requirements more stringent.

In FIFA's support and influence, synthetic grass performance in different regions, especially in developing countries has been greatly improved. synthetic grass products in environmental protection are also increasing public concern, the German standard DIN relevant tests have been widely used in synthetic grass tests.

Wednesday, July 17, 2013

artificial grass materials, working materials arrangement measures



artificial grass materials, working materials arrangement measures

artificial grass artificial grass Engineering Materials engineering entity constitutes the material basis, in the implementation process, only to ensure the supply of materials, in order to ensure the smooth implementation of artificial grass, artificial grass otherwise it will affect the progress of the project and delay period. Therefore, we must do the construction, prepare materials. Special materials, semi-finished and finished ahead of orders. Material testing system and developing an implementation custody system. We use the following measures to ensure that the duration is complete.
        1artificial grass pre-construction projects, arrange for professionals to implement all the necessary supplies and materials, semi-finished program material by the company responsible for procurement personnel departments and on-site materials, semi-finished goods and work approach. For sand, cement, grass and other large selection of quality materials to be relatively stable manufacturers products and make the appropriate quality inspection procedures.
        Two on-site management staff to follow the requirements of the construction schedule, well in advance of the arrival of materials and working materials, plan to do on-site materials and Chi materials planned, in the order to approach supply.
        3 develop a comprehensive approach detailed material plan, the availability of materials, cement, sand, stone and other storage capacity of not less than five days of its construction demand in order to meet the construction schedule needs.
        4 Press the new materials, new technology and new technology requirements, the implementation of artificial grass and working materials approach the project plan. Other measures
        A project manager who develop a daily habit of understanding the weather, according to weather changes and to adjust working arrangements.
        Two major construction workers daily discussions to determine next steps and working arrangements for staff, guarantee period completed on schedule.
        3 in a timely manner to maintain close contact with the side of the building and communication to ensure that artificial grass works smoothly.
        The fourth part of the management organization, management, staffing
        Project organization
        To strengthen the construction management, strengthen the construction of the artificial grass project leadership and coordination of the work, the establishment of artificial grass project manager for the Department. Implementation of the project management method, the company appointed Zhen Zhihui artificial grass engineer as a project manager, Lee Second Division artificial grass as a technical engineer responsible person solely by the project manager responsible for the artificial grass works and is directly responsible to the company. The project manager is artificial grass project quality, safety, construction progress, civilization, and other work-site first responsibility, technical director of the artificial grass is the project site and on-site technical and quality and safety of civilized persons directly responsible, the project manager functions related to personnel under the leadership of the project manager, the organization managing the artificial grass works.

Monday, July 15, 2013

Kindergarten is laying artificial grass or plastic mats?


Kindergarten is laying artificial grass or plastic mats?

Most kindergartens for the safety of children most are lined with plastic mats or artificial grass, but in the end the use of artificial grass or plastic mats do?

Plastic mats common specifications and breadth were 500mm, 500m ,30-50mm. Surface color red or green. The mats can be laid to the interior can also be used outdoors. The same artificial grass also can be used for indoor and outdoor. So in the end how to choose them? Personally feel that it is best to use outdoor plastic mats especially kindergartens slides with plastic mats following is the most appropriate to be able to better ensure the safety of children. If you use artificial grass enhanced if the proposed use of artificial grass so that the thickness of the elastic on both the guarantee. In fact, on nursery is laid artificial grass or plastic mats in my personal opinion are possible, both for the interior, it is a good choice for outdoor use, then I am more inclined to plastic mats, especially children's play area plastic mats, then in terms of security better than artificial grass.

Kindergarten is the use of artificial grass or plastic mats are possible both for indoor, outdoor play areas for the individual, then more inclined plastic mats.

Wednesday, July 10, 2013

The primary component of polyethylene artificial turf is non-biodegradable materials


artificial turf on the relative activity characteristics of natural turf advantage of excellent field homogeneity, flatness, but also much better, you can prevent abundant due to weather, maintenance and other elements of adverse site conditions formed, and then affect competition.

The impact of the situation on the air condition affecting natural lawn constituted by the green plants, can be subjected to reasonable light collaboration with these lifelong metabolic process receives carbon dioxide and release oxygen, and can receive sulfur dioxide, hydrogen fluoride, ammonia, chlorine and other toxic gases, purify the effect of air. There are distinct natural turf blocking effects of dust, measured according marked life in scraping thirty-four wind, bare ground air dust concentration of 13 times over the lawn. Studies show, 25 square meters of lawn can be a small reception I fully exhaled carbon dioxide, is converted into oxygen, contentment human respiratory oxygen required for the process. artificial turf is made of polyethylene, polypropylene and other polymers made from non-living matter, can not introduce new movement for green plants, and not having a conditioning effect of atmospheric oxygen balance. Although artificial turf can be blocked to some extent, the dust, but does not have to receive toxic gas purification function of the atmosphere. In addition, low levels of artificial turf fiber technology often contain chlorine impurities at high temperatures, strong sunlight premise would differentiate and release chlorine and damage air quality.

The impact of weather natural turf rootzones is mixed sediment body structure has plenty of pore water and precipitation processes can accumulate water, play water cultivation effect. Hot weather, the turf grass with roots deep in the water received through transpiration effect take four weeks the situation a lot of heat, useful for lowering the ground temperature, conditioning necessarily within the confines of the small weather. artificial turf plateau bed structure made of rubber, concrete or asphalt composition, water simply can not play the cultivation effect, so can not reduce the surface temperature and the heat capacity is small, resulting in surface temperature significantly higher than the air temperature, especially in the block-style stadium this problem is more severe. Summer noon hours, artificial turf venue can look to the surface near the heated air has clearly distorted picture. For the implementation of the data indicated, 30 ℃ high temperature above premise, the appearance of natural turf uniform temperature below the temperature of 2 ℃ to 3 ℃, while the artificial turf surface temperature is higher than the temperature 6 ℃ to 11 ℃, and with rising temperatures, artificial turf surface temperature rise should be clear than natural turf. In the summer, artificial turf surface temperature is very high, if the attack at this time compared to its use by intense friction, contact with the skin will suffer severe damage.

The final product of natural grass hay residues that occur in the floor bed sediment microbial differentiation effect, the conversion of organic matter in the soil from the new back. Final scraps non-toxic, harmless sediment inclusion bodies, one can add organic matter to improve after another he used to do.

The primary component of polyethylene artificial turf is non-biodegradable materials, after 8-10 brother of the cuts, the composition of several tonnes of polymer waste. Common foreign takeover by professional companies to receive degradation, and then complete the capital regeneration applications, domestic Highways engineering can be used as the foundation of filler. Going to other uses, such as by the need to eliminate the root of asphalt or concrete bottom.

Friday, June 28, 2013

Professional Soccer&Football Grass S50117


S50117(Professional Soccer/Football Grass)

Features:

1)Natural appearance

2)Made of diamond shaped monofilament

3)Strong color-fastness

4)Excellent durability and resilience

Specifications:

Pile height 20-65mm
Yarn weight 11000 Dtex
Yarn type PE / Monofilament / 8 F
Color         Dark Green, Lemon Green, Bi-Color(Mixed)
Guarantee 6-8 years

artificial lawn


This product information comes from TurfSoccer.